Analytics cookies

With your permission, we use Google Analytics to understand how this website is used. You can decline and continue using the site.

Privacy notice
Skip to content
HQC — High Quality Construction
Investment case

Selling a Bali Leasehold: How Resale Works

Yes, a Bali leasehold can be sold, if the lease allows it. How an assignment works during construction and after completion, what the remaining term and extension clause mean to a buyer, and which documents a resale buyer will ask for.

11 min read
A completed Black Rock villa in Bali, one of three villas in the complex, with Villa #2 currently available through resale

In brief: yes, you can sell leasehold property in Bali. What you sell is not the land but your position under the lease: the years you have left, plus any contractual right to extend. The sale is an assignment, recorded in a notarial deed, and it works smoothly when the lease expressly allows it. A buyer will judge the asset by three things: how many years remain, how firmly the extension is written, and how complete the paperwork is. The time to check all three is before you buy, not when you decide to sell.

Can you sell leasehold property in Bali?

Yes. Indonesian land law recognises a right of lease for building (hak sewa untuk bangunan), which the Basic Agrarian Law (Law No. 5 of 1960), Articles 44 and 45, defines as the right to use land owned by another person for a building, in exchange for rent. Foreigners resident in Indonesia are among those who may hold it. A Bali leasehold is a lease contract over land you do not own, so it can be passed on, but only on the terms of that contract and the Civil Code rules on leases.

The key rule sits in Article 1559 of the Indonesian Civil Code: a tenant who is not permitted to do so may not hand the lease over to another person, on pain of cancellation of the lease and compensation. In practice this means one of two routes. If the lease contains an assignment clause, you assign the remaining term to the buyer, who steps into your position on the existing terms. If it does not, the landowner has to agree, either to the assignment or to a new lease granted directly to the buyer, and a landowner asked for consent at that moment holds the stronger hand.

For the choice between leasehold and freehold in the first place, see our hub on leasehold vs freehold in Bali. How resale differs by format, whether a villa, an apartment or a hotel room, is covered in villa, apartment or hotel room. This article stays on the mechanics of the exit itself.

When can a Bali leasehold be resold: during construction or after completion?

There are two distinct moments to sell, and they are different transactions.

Selling during construction

Before handover, the property does not yet exist as a finished building. What you sell is a contract position: your rights under the lease, the construction agreement with the developer and the payment plan. The buyer takes over the instalments still to be paid and the right to receive the completed unit. The questions that decide it: does the developer allow assignment before completion, from what point, and will the developer, the landowner and any operator recognise the new holder without fresh negotiation?

The Civil Code rule for transferring intangible rights is Article 613 of the Civil Code: rights in intangible property are transferred by an authentic or private deed, and the transfer has no effect on the party bound by those rights until it has been notified to them, or they have approved or acknowledged it in writing. This is why a resale buyer will insist that the developer and the landowner are formally notified, and ideally sign an acknowledgment.

At HQC, the developer imposes no restrictions on the assignment of rights or the resale of a property. An investor may sell a unit during construction once the first instalment under the payment plan has been made, as well as after the property is commissioned. For Satori, units are individually titled on the lease and can be transferred.

Selling after completion

After handover, the buyer takes over a finished, inspectable property with its permits, its handover documents and, for a hotel-operated unit, its operator agreement. The question shifts from "will it be built?" to "how many years are left, and what does the paperwork prove?". Resale of completed property is already part of the HQC portfolio:

  • Black Rock. A 32-year leasehold with a contracted priority extension. On a completed resale, the land transfers to the buyer directly from the owner at the deal. Villa #2 is currently available through resale, as described on the Black Rock project page.
  • Ardhana villas. Completed in June 2025 and now occupied; availability is through resale.
  • Dzen, Ubud. The original release sold out, and 8 of 10 villas have since been resold. Completed villas can become available through resale, transferable on their freehold title.


During construction

After completion

What the buyer takes over

Lease rights, construction agreement and the remaining payment plan

Lease rights over a finished, handed-over property

Main buyer risk

Delivery: will the unit be completed as specified?

Term and condition: how many years remain, and how is the building kept?

Who must be notified

Developer and landowner; the operator if the unit is hotel-operated

Landowner; the operator or management company where there is one

What the buyer checks first

Construction progress, payment records, the assignment clause

Permits, handover documents, tax receipts, the extension clause

HQC rule

Allowed once the first instalment is made

Allowed after commissioning, with no developer restrictions

What do the remaining term and the extension clause do to a buyer's interest?

You cannot sell more time than you hold. A buyer acquires exactly the years left on the lease, and the terms of the extension option, as written. Two leases with the same headline number can therefore look very different to a buyer five or ten years later.

The remaining term is the only certain part of the lease, and as it shortens the pool of buyers narrows. That is where the extension clause comes in. A buyer will ask whether the option to extend passes to them on assignment, whether the basis for the extension fee is fixed now or left to be agreed later, and what notice must be given, by whom and when.

The detail of what makes an extension enforceable is set out in our guide to Bali leasehold extension terms. For resale, the point is simpler: an extension right that is written into the notarised master lease, assignable with the term and priced on a known basis, is something you can hand to a buyer. A verbal promise is not.

Two further rules protect a buyer. Under Articles 1575 and 1576 of the Civil Code, a lease does not end on the death of either party, and a sale of the land does not end an existing lease unless that right was reserved in the lease. A buyer will still want the extension option drafted to bind the landowner's heirs and successors.

Which documents will a resale buyer ask for?

A careful buyer, and the notary acting on the transfer, will ask for the same file. Keeping it complete from the day you buy is the single cheapest thing you can do for your exit.

  • The notarised lease, with every amendment, and the clauses on assignment, extension and inheritance clearly identifiable.
  • The land certificate held by the landowner, so the buyer can confirm the person who granted the lease is the registered holder and that the land is not encumbered.
  • The construction agreement with the developer and, for a hotel-operated unit, the agreement with the management company or operator.
  • Payment records: invoices and receipts for every scheduled instalment, which prove what has been paid and what the buyer is taking over.
  • Handover documents confirming completion, for a resale after commissioning.
  • Building permits. Under Government Regulation No. 16 of 2021, the PBG is the approval to build, and the SLF is the certificate issued by the regional government that a building is fit for use before it can be occupied.
  • Land and building tax receipts (PBB) showing no arrears, and any rental licences if the property is let to guests.

HQC buyers receive this set at purchase: the leasehold agreement registered with an Indonesian notary, the construction agreement, the operator or management agreement, invoices and receipts for each scheduled payment, and the handover documents on completion. The full list is in our FAQ.

How does the transfer itself work?

The sequence is broadly the same for any well-documented leasehold. Treat it as an outline to discuss with a notary.

  • Read the assignment clause. Confirm whether the lease allows assignment outright, requires notice, or requires the consent of the landowner or developer.
  • Agree terms with the buyer, including what is transferred: the remaining term, the extension option, furniture and fittings, and any operator arrangements.
  • Sign a notarial deed of assignment with the buyer, before an Indonesian notary.
  • Notify the other parties: the landowner, the developer during construction, and the operator where there is one. Under Article 613 the transfer binds them once notified or acknowledged in writing.
  • Settle tax with an adviser. How a lease assignment is taxed depends on how the transaction is structured. Indonesian rules treat land-and-building lease income under Government Regulation No. 34 of 2017 separately from transfers of registered land rights, and practitioners disagree on how a leasehold resale should be classified: compare Bali Property Rules with Rumavi. Confirm the treatment with an Indonesian tax adviser before you sign.

Why does time-to-sell belong in the investment plan?

A sale is a period, not an event: you need a buyer who wants this property, with this term remaining, and who is ready to complete due diligence. Resale guides published by Bali practitioners, such as Bali Property Rules and Rumavi, put the process from listing to completion in months rather than weeks, and longer where the remaining term is short or documents are missing.

That is why our Why Bali page advises allowing for a resale period rather than assuming an immediate buyer. In practice this means three things at the planning stage. First, do not fund a near-term commitment from a sale you have not yet made. Second, decide in advance when you would sell, relative to the remaining term, rather than reacting late. Third, choose a property whose documents, permits and extension terms will still read well to a buyer you have never met.

An exit checklist to use before you buy

  • Does the lease expressly allow assignment, and to whom: any buyer, or only with consent?
  • Can the unit be assigned during construction, and from which payment stage?
  • Does the extension option pass to a buyer with the remaining term?
  • Is the basis for the extension fee written down now, and recorded in the notarised master lease?
  • Does the lease bind the landowner's heirs and successors?
  • Will the developer and operator acknowledge a new holder in writing?
  • Are the PBG, and on completion the SLF, in place and matching the building?

Frequently asked questions

Can a foreigner sell a Bali leasehold to another foreigner?

In principle, yes. A leasehold is a contractual right, and the Basic Agrarian Law names foreigners resident in Indonesia among those who may hold a right of lease for building, so a foreign seller can assign it to a foreign buyer, provided the lease permits assignment or the landowner consents. A buyer who is not resident in Indonesia should confirm with the notary how the lease will be held.

Does the extension right go to the buyer?

Only if the lease says so. Check that the extension option is assignable together with the remaining term, and that the deed of assignment transfers both.

Do I need the landowner to sign?

That depends on the lease. Article 1559 of the Civil Code bars a tenant from handing a lease to someone else without permission. If the lease already grants that permission, notice is usually enough; if not, the landowner must agree.

When can an HQC unit be resold?

HQC imposes no restrictions on assignment or resale. A unit can be sold during construction once the first instalment under the payment plan has been made, or after the property is commissioned.

Which documents will a resale buyer ask for?

The notarised lease with every amendment, the landowner's land certificate, the construction agreement and any operator agreement, the payment records, the handover documents after completion, the PBG and SLF, and land and building tax (PBB) receipts showing no arrears.

How long does it take to sell a Bali leasehold?

Resale guides by Bali practitioners put the process from listing to completion in months rather than weeks, and longer where the remaining term is short or documents are missing. Plan for a resale period rather than an immediate buyer.

If you are weighing a Bali property partly on how you would exit it, ask to see the master lease and the assignment clause before anything else. Our FAQ explains how resale works across HQC projects, and the Black Rock page shows a resale in practice. Talk to the HQC team to review the documents for the project you are considering.

Continue reading