Analytics cookies

With your permission, we use Google Analytics to understand how this website is used. You can decline and continue using the site.

Privacy notice
Skip to content
HQC — High Quality Construction
Why HQC

High Quality Construction in Bali

We don't ask you to take a rendering on faith. We ask you to check the concrete.

HQC builder in front of the structural frame on a Bali site
2023
Founded in 2023
7
Premium complexes
814
Units in the portfolio
$166.2M
Company portfolio value
800+
800+ team on the ground: 100+ staff engineers and managers, plus 700+ people working on company construction sites every day.
01 · The people who build

700+ builders on site daily

From the foundation to the finish, the same in-house teams carry a project the whole way — 800+ team members, including 100+ office specialists and 700+ builders on site daily.

The HQC site crew in front of the Ardhana structure
02 · Engineering Perfectionism

Open access to the construction site

HQC standards mean uncompromising quality in everything:

Engineering control

Key structural decisions undergo additional review by specialised engineers.

ProofSpecialised engineers review every key structural decision

Industrial-grade concrete

Grade 27+ MPa with laboratory control of composition and a 10-day curing period.

ProofCertified batches, lab-controlled

Legal foundation

The PBG permit is obtained and verified before any equipment arrives on site.

ProofPermit before equipment, always

Premium engineering

ABB systems, KONE elevators with same-day service, and manifold-based utility distribution to prevent leaks in the tropics.

ProofABB electrics · KONE lifts · manifold MEP
03 · Capital Security

Multi-stage land verification and long-term warranties

Legal immunity for your capital: risk-free land through a threefold boundary check in the land registry (BPN) with neighbours physically present and signing off on the deeds, and a triple transaction audit — legal integrity verified by three independent notary pools.

10 years

10-year warranty on load-bearing structures and the pool shell

12-month warranty on the interior finishes of all premises

04 · Who you will reach

There is a name to ask for

Dmitry Barannik, co-founder of HQC, construction and structural works

Dmitry Barannik

Co-founder of HQC · Construction & Structural Works

Civil engineer (Ural Federal University); 15 years in construction, from tradesman to head of major projects. 550,000+ m² of premium residential and commercial space completed across the CIS. On Bali, personally led Black Rock, Ardhana and Dzen Green Fields.

Igor Bazanov, co-founder of HQC and CEO of PT HQC

Igor Bazanov

Co-founder of HQC · CEO of PT HQC

Graduate of the Institute of Public Administration and Management, RANEPA. Responsible for architecture and design, project concepts, overall vision and strategic management.

Anton Zanimonets, managing partner of HQC and CEO of BLOOM

Anton Zanimonets

Managing Partner of HQC · CEO of BLOOM

PhD in Philology (Moscow State University), MBA; 15 years in investment management. Founder of Iskander.vc (AUM of about IDR 1.1 trillion), co-founder of the Bali Developers Association; brings top-tier international hotel operators into projects.

05 · Recognition

Independent recognition

HQC at the Real Estate Asia Built Environment Awards 2025 ceremony in Singapore
  1. 2025

    Resort Construction of the Year — Indonesia

    Real Estate Asia Built Environment Awards 2025, Singapore — for Satori Nusa Dua Resort.

  2. 2025

    Luxury Hospitality Interior Design of the Year — Indonesia

    Real Estate Asia Built Environment Awards 2025, Singapore — for Satori Nusa Dua Resort.

Hotel brand partners

Global hotel chains don't gamble with their reputation

Before lending their brands to Satori, Ardhana and Bloom, they conducted rigorous technical and legal due diligence on our properties. For investors, this partnership translates into concrete financial results:

  • +30% to ADRa premium nightly rate driven by brand strength.
  • +35% to RevPARhigher revenue per available room.
  • +12% to occupancya steady flow of guests thanks to global loyalty networks.
  • Wyndham Hotels & Resorts
  • Accor
  • Radisson Hotels
06 · Questions

What investors ask us first

What is HQC?

A vertically integrated developer on Bali doing design, construction, MEP, furniture and management in-house, partnered with Wyndham, Accor and Radisson.

What legal entity do I sign with?

You sign with a registered Indonesian company (PT) holding the lease — a clean, compliant structure, never a nominee arrangement.

Does HQC actually deliver, or is this an off-plan promise?

Black Rock, Dzen Green Fields and the Ardhana villa quarter have completed construction. Other builds have dated site reports; HQC was founded in 2023.

Who manages the residences after completion?

Bloom is fully managed by Radisson. Satori and the Ardhana hotel run under the Accor and Wyndham brands on a franchise basis, operated day to day by HQC; Aravita is run by HQC’s own management company.

What happens if HQC misses a deadline?

Construction milestones and remedies are written into the contract — ask your consultant for the specific clause for your project.

Can I visit an active site before buying?

Yes — on-site viewings can be arranged any day, by appointment.

The whole case, in one place

Same island. A different developer.

Start here

Request the Investor Pack

  • The full catalogue with floor plans
  • Project details from the HQC team
  • A direct line to the team

All fields are required.

Privacy notice (opens in a new tab)

Prefer to talk first? Reach us directly.