Analytics cookies

With your permission, we use Google Analytics to understand how this website is used. You can decline and continue using the site.

Privacy notice
Skip to content
HQC — High Quality Construction
About HQC

A developer that builds what it sells

Design, construction, MEP, furniture and management under one roof — the only developer on Bali partnered with Wyndham, Accor and Radisson, and the only foreign developer building under the Accor brand on the island.

01 · Our credo

“We build as if for ourselves — and are proud of it”

HQC is High Quality Construction: a vertically integrated Bali developer doing design, construction, MEP, furniture and management in-house. Regular technical inspection on every site, eco-conscious natural materials, and buildings made to settle into the landscape rather than fight it.

3
Completed developments, including the Ardhana villa quarter
7
Premium complexes
3
Global hotel brands
10 years
Structural guarantee
End-to-end
Design, build, MEP & furniture in-house
02 · Built area, by stage

A pipeline you can measure

Completed7,636 m²
Under construction31,549 m²
In design20,018 m²
Commercial + residential · Bali
03 · Leadership

Three leaders, one standard

The HQC leadership with the site crew in front of the Ardhana build

Two co-founders and a managing partner carry one standard end to end — commerce, construction and operations — so the people who design a building are the people who answer for it.

  • Wyndham · Accor · Radisson
  • The only foreign developer building under the Accor brand on Bali
Dmitry Barannik, co-founder of HQC, construction and structural works

Dmitry Barannik

Co-founder of HQC · Construction & Structural Works

Civil engineer (Ural Federal University); 15 years in construction, from tradesman to head of major projects. 550,000+ m² of premium residential and commercial space completed across the CIS. On Bali, personally led Black Rock, Ardhana and Dzen Green Fields.

Igor Bazanov, co-founder of HQC and CEO of PT HQC

Igor Bazanov

Co-founder of HQC · CEO of PT HQC

Graduate of the Institute of Public Administration and Management, RANEPA. Responsible for architecture and design, project concepts, overall vision and strategic management.

Anton Zanimonets, managing partner of HQC and CEO of BLOOM

Anton Zanimonets

Managing Partner of HQC · CEO of BLOOM

PhD in Philology (Moscow State University), MBA; 15 years in investment management. Founder of Iskander.vc (AUM of about IDR 1.1 trillion), co-founder of the Bali Developers Association; brings top-tier international hotel operators into projects.

04 · Why owners trust us

Built to a standard, backed in writing

A 10-year structural guarantee, contracts under a registered Indonesian company, in-house design, construction, MEP and furniture, regular technical inspection with photo and video documentation, and three global hotel operators on our projects — the six things you cannot see are set out, with their proof, on the Quality page.

10 years

10-year warranty on load-bearing structures and the pool shell

12-month warranty on the interior finishes of all premises

05 · Recognition

Independent recognition

HQC at the Real Estate Asia Built Environment Awards 2025 ceremony in Singapore
  1. 2025

    Resort Construction of the Year — Indonesia

    Real Estate Asia Built Environment Awards 2025, Singapore — for Satori Nusa Dua Resort.

  2. 2025

    Luxury Hospitality Interior Design of the Year — Indonesia

    Real Estate Asia Built Environment Awards 2025, Singapore — for Satori Nusa Dua Resort.

06 · In their words

A full-cycle developer, on site

We are filming a long-form conversation with the founders on how international engineering reaches the tropics. Until it lands, this is the work itself — our sites from the air, from our own drone footage.

Founder interview — coming soon
07 · Track record

Construction completed

Open the catalogue →
Ardhana luxury villa with infinity pool, day
Construction completeCompleted 2025

Ardhana Villas

Bukit

23 villas — 16 Luxury and 7 Fengshui — completed June 2025

Hotel brand: WyndhamLeasehold

Price on request

View
Dzen Green Fields villa among the palms
Sold outCompleted May 2025

Dzen Green Fields

Ubud

Boho villas among the rice terraces — 10 villas

Best resale case: 8 of 10 villas resold, investor returns of 35% to 170% on invested capital.

Past results, not a guarantee.

Freehold

Price on request

View
Black Rock villa exterior
Construction completeOperating since 2024

Black Rock

Bukit

3 barnhouse villas — operating since Aug 2024

Leasehold

Price on request

View
Talk to the team

Get the full picture

  • The full catalogue with floor plans
  • Project details from the HQC team
  • A direct line to the team

All fields are required.

Privacy notice (opens in a new tab)

Prefer to talk first? Reach us directly.