Analytics cookies

With your permission, we use Google Analytics to understand how this website is used. You can decline and continue using the site.

Privacy notice
Skip to content
HQC — High Quality Construction
Black Rock villa exterior at dusk
HQC · Projects · Black Rock · Bukit, Ungasan

Black Rock

Three barnhouse villas, built and lived in — the proof that HQC delivers.

Construction complete · Operating since 2024

Delivery
Operating since 2024
Tenure
Leasehold
Selected collection
3 barnhouse villas — operating since Aug 2024
From
Price on request
01 · The concept

Finished, furnished and already operating

Villas for those who have a taste for life

Black Rock — double-height living space with panoramic glazing
Black Rock rooftop lounge with sofa and umbrella
Black Rock by HQC entrance sign

Black Rock is a completed mini-complex of three barnhouse villas in the centre of the Bukit at Ungasan, completed and operating since August 2024. The design leans deliberately masculine — each villa conceived as a “piece of rock”, with double-height living space, large panoramic glazing, a rooftop lounge and a choice of light or dark bedroom finish. The available unit, Villa #2, offers two bedrooms and two bathrooms across 151 square metres on a plot of about two are, with a private filtered pool, a dedicated workspace and anti-mould waterproofing. As a finished, professionally managed asset, it is already live on the major booking platforms.

Floors
2
Plot
~2 are
Pool
Private · filtered
Management
Professional management company
02 · location

Central Bukit, well connected

Black Rock sits in the centre of the Bukit at Ungasan — minutes from the daily essentials and the peninsula’s best beaches, in the practical heart rather than on a remote clifftop.

  1. Main road2 min
  2. Cafés5 min
  3. Parq Blue (under construction)5 min
  4. Gym7 min
  5. Melasti beach13 min
Open location in Maps →

HQC project location · Black Rock

03 · the tour

Tour video

Black Rock archive walk-through — August 2024

Black Rock archive walk-through — August 2024

04 · amenities

Finished to an audited engineering standard

Living

Private pool, every villa

Each villa has its own pool with quality water filtration

Rooftop relaxation zone

An open rooftop terrace for the evenings

Dedicated workspace

A separate space to work from the villa

Double-height living

Double-height living space under panoramic glazing

Engineering

Multi-stage water filtration

Clean water engineered in, not assumed

Anti-mould hydro insulation

Built against Bali’s humidity from the structure up

Bike & car parking

On-plot parking for two-wheelers and cars

06 · the residences

By typology

Three villas in total; Villa #2 — two bedrooms and two bathrooms across 151 m² on a plot of about two are — is the available residence, handed over turnkey with furniture, appliances and a private filtered pool.

Black Rock Villa #2 ground-floor plan preview
2 layouts
Area
151 m²
View
Courtyard · jungle
Request pricing →

Preview includes ground- and upper-floor layouts for Villa #2; full-resolution sheets are sent as part of the presentation.

TypologyAreaView
Villa #2 (2 bed · 2 bath)151 m²Courtyard · jungle
07 · why it's safe to own

The reassurance, before you ask

Build guarantee

10-year structural guarantee

Completed in 2024 and operating, with multi-stage water filtration already installed.

Legal & tenure

Leasehold 32+30 via PT HQC

A 32-year leasehold with a contracted priority extension; on a completed resale the land transfers to the buyer directly from the owner at the deal.

08 · delivery & terms

Dates, terms and what is included

  1. 01

    Built and completed in 2024

    The complex was finished and launched in August 2024 — the photography and walk-throughs are of the actual built villas, not renders.

  2. 02

    Leasehold 32 + 30 via a registered structure

    A 32-year leasehold with a contracted priority extension; on a completed resale the land transfers to the buyer directly from the owner at the deal.

  3. 03

    Turnkey, and already operating

    Villa #2 is handed over fully furnished and appliance-equipped, run day to day by a professional management company and live on the major booking platforms.

Why Black Rock is the low-risk entry

  • A completed, operating build finished in 2024 — you buy something you can stay in tonight, not a render.
  • Professionally managed and already live on the major booking platforms — turnkey from day one.
  • A strict barnhouse design in the central Bukit, minutes from cafés, a gym and Melasti beach.
  • Land held under a registered structure, transferable on resale, with a contracted priority extension.
09 · questions

What buyers ask us first

Is Black Rock already built?

Yes — the complex launched in August 2024 and has been operating since.

How many villas are there?

Three villas in total; Villa #2 — two bedrooms and two bathrooms across 151 square metres — is currently available through resale.

Who manages the villa?

A professional management company runs the complex, and the villa is already listed on the major booking platforms.

What is the architectural style?

A strict, masculine barnhouse — panoramic glazing, double-height living space and a rooftop lounge, with a light or dark interior scheme.

Does each villa have its own pool?

Yes — a private pool with multi-stage water filtration in every villa.

What does the lease structure mean for me?

A thirty-two-year leasehold with a contracted priority extension, transferred from the owner at the deal and held under a registered structure. The exact terms are in the pack.

Where exactly is Black Rock?

In the centre of the Bukit at Ungasan: the main road is two minutes away, cafés five, a gym seven and Melasti beach thirteen.

What comes with Villa #2?

It is turnkey: fully furnished and equipped with appliances, with a private filtered pool, a dedicated workspace, a rooftop relaxation zone and anti-mould waterproofing.

10 years

10-year warranty on load-bearing structures and the pool shell

12-month warranty on the interior finishes of all premises

Other projects

Aerial view of Ardhana hotel and central pool
Active constructionQ3 2027

Ardhana Hotel

Bukit

58 hotel rooms — apartments and loft suites

Hotel brand: WyndhamLeasehold

Price on request

View
Bloom hotel building render
Active constructionQ1 2028

Bloom

Bukit

Design hotel, 103 hotel rooms · Ungasan

BY Radisson IndividualsLeasehold

Price on request

View
Satori Nusa Dua Resort, main building day render
Active constructionQ3 2027

Satori Hotel

Nusa Dua

116 hotel rooms, 28.6–46.7 m²

REA Award 2025

Hotel brand: AccorLeasehold

Price on request

View
Request

Get the Black Rock presentation

  • The full catalogue with floor plans
  • Project details from the HQC team
  • A direct line to the team

All fields are required.

Privacy notice (opens in a new tab)

Prefer to talk first? Reach us directly.