Analytics cookies

With your permission, we use Google Analytics to understand how this website is used. You can decline and continue using the site.

Privacy notice
Skip to content
HQC — High Quality Construction
Bali · Indonesia

Construction quality that builds trust

We don't sell renderings. We build properties whose quality can be verified directly on the construction site, any day.

$166.2M
Company portfolio value
814
Units across 7 complexes
Up to 35%
Value growth by completion
Up to 8%
Rental yield

Company-level indicators, not a guarantee of future results.

Global Quality Standards: Partnering with leading international hotel brands

Wyndham Hotels & Resorts
Accor
Radisson Hotels
Satori — Accor · Ardhana — Wyndham · Bloom — BY Radisson Individuals

Partnerships that drive higher returns

  • +30% to ADR — a higher nightly rate driven by the brand name
  • +35% to RevPAR — higher revenue per available room
  • +12% to occupancy — driven by global loyalty programmes and direct bookings

HQC on Bali

A developer that builds what it sells

The standards of the world's leading hoteliers. Confirmed by partnership with Wyndham, Accor and Radisson.

HQC is a vertically integrated developer — design, construction, MEP, furniture and management under one roof. The only developer on Bali partnered with Wyndham, Accor and Radisson, and the only foreign developer building under the Accor brand on the island.

A short look at the island, the sites and the construction standard behind the residences — from our own drone footage.

The HQC and Accor teams at the Satori brand-agreement signing
The HQC and Accor teams at the Satori brand-agreement signing

The collection of residences: from concept to operation

Open the catalogue →
Satori Nusa Dua Resort, main building day render
Active constructionQ3 2027

Satori Hotel

Nusa Dua

116 hotel rooms, 28.6–46.7 m²

REA Award 2025

Hotel brand: AccorLeasehold

Price on request

View
Satori villa exterior at dusk
Active constructionQ3 2027

Satori Villas

Nusa Dua

38 private-pool villas, 48–128 m², 1–4 bedrooms

Hotel brand: AccorLeasehold

Price on request

View
Aravita 4-bedroom villa exterior, day
Active constructionQ2 2028

Aravita Residence

Nusa Dua

Gated Japandi villa club — 75 villas, 1–4 bedrooms

Leasehold

Price on request

View
Aerial view of Ardhana hotel and central pool
Active constructionQ3 2027

Ardhana Hotel

Bukit

58 hotel rooms — apartments and loft suites

Hotel brand: WyndhamLeasehold

Price on request

View
Ardhana luxury villa with infinity pool, day
Construction completeCompleted 2025

Ardhana Villas

Bukit

23 villas — 16 Luxury and 7 Fengshui — completed June 2025

Hotel brand: WyndhamLeasehold

Price on request

View
Bloom hotel building render
Active constructionQ1 2028

Bloom

Bukit

Design hotel, 103 hotel rooms · Ungasan

BY Radisson IndividualsLeasehold

Price on request

View
Dzen Green Fields villa among the palms
Sold outCompleted May 2025

Dzen Green Fields

Ubud

Boho villas among the rice terraces — 10 villas

Best resale case: 8 of 10 villas resold, investor returns of 35% to 170% on invested capital.

Past results, not a guarantee.

Freehold

Price on request

View
Black Rock villa exterior
Construction completeOperating since 2024

Black Rock

Bukit

3 barnhouse villas — operating since Aug 2024

Leasehold

Price on request

View

Our portfolio comprises 7 complexes, one of them still in design. Satori and Ardhana each have separate hotel and villa cards; these 8 cards present 6 complexes, while the complex in design is not yet in the showcase.

Independent recognition

HQC at the Real Estate Asia Built Environment Awards 2025 ceremony in Singapore
  1. 2025

    Resort Construction of the Year — Indonesia

    Real Estate Asia Built Environment Awards 2025, Singapore — for Satori Nusa Dua Resort.

  2. 2025

    Luxury Hospitality Interior Design of the Year — Indonesia

    Real Estate Asia Built Environment Awards 2025, Singapore — for Satori Nusa Dua Resort.

How international construction standards reach resort real estate

Open-book costing

Land, materials and labour accounted for openly — no padding, no surprises

ProofItemised estimates annexed to every contract

Audited MEP

Plumbing and electrical under independent lab control — not the local minimum

Own furniture factory

Joinery, beds and casegoods produced in our own Bali workshop

ProofOwn 4,000 m² factory producing all custom joinery

Premium equipment

ABB electrical systems, KONE lifts and lab-tested climate and pool equipment

ProofAn energy passport documented for every villa

Three-stage QA

Engineering, finishing and operator handover inspections on every unit

ProofRegular technical inspection with photo and video documentation

Registered PT entity

An Indonesian company holds the lease — you sign with a registered legal entity

ProofPT HQC contracts direct, no nominee structures

Why Bali holds value

A year-round tropical season, an established five-star hospitality market on the Bukit and in Nusa Dua, and ownership paths — leasehold and freehold — open to foreign investors.

365
days of tourist season
Five-star
hospitality neighbours nearby
Year-round
rental demand
Leasehold + Freehold
ownership paths
Read the Bali market view →
Dzen Green Fields villas among the Ubud rice terraces, from the air

Real standards instead of renderings. Check the quality for yourself

Watch the film →
The Ardhana hotel frame rising beside the completed villas, from the air

Structural Build Quality

  • Regular technical inspection of construction work with photo and video documentation of key stages

    Key structural decisions undergo additional review by specialised engineers.

  • Grade 27+ MPa concrete: certified batches with laboratory control of composition

  • 10-day concrete curing — control of the concrete mix, pouring technique, curing process, and formwork removal timing

  • Seismic resilience: joints engineered for the region's extreme load conditions

Signing the management agreement

Legal Immunity

  • PBG before work begins: the building permit is issued and verified before any equipment arrives on site

  • Land audit (BPN): cadastral boundary verification involving neighbours and a notarised deed

The HQC furniture factory team on the workshop floor

Engineering & Operations

  • World brands: ABB and KONE systems with same-day service

  • MEP engineering: manifold-based utility distribution — leak protection and easy access

    Plumbing and electrical inspected by our in-house lab on every project.

  • Regular technical inspection of construction work with photo and video documentation of key stages

  • In-house production: solid teak furniture made at our own 4,000 m² factory

The Radisson Individuals hotel management agreement for Bloom

Protection built into every contract

We minimise risk before construction even begins. All leasehold extension terms, technical warranties, and legal parameters of the property are fixed in a notarised agreement — no hidden terms, no legal grey areas.

  • Guaranteed extension

    The right to extend the leasehold at a fixed cadastral value — protection from market speculation.

  • Legal certainty

    Warranties on the structure, finishing, and the PBG permit are written directly into the contract.

  • Land immunity

    A threefold boundary check through the land registry (BPN) with sign-off from neighbours — completely eliminating territorial disputes.

  • Three-tier audit

    The legal integrity of every transaction is verified by three independent notary pools.

Built to last

10 years

10-year warranty on load-bearing structures and the pool shell

12-month warranty on the interior finishes of all premises

What investors ask us first

See all questions
What is HQC?

HQC (High Quality Construction) is a vertically integrated Bali developer of villas, apartments and branded resorts. Design, construction, MEP, an in-house furniture factory and our own management company sit under one roof, with 800+ people on the ground: 100+ staff engineers and managers, plus 700+ people working on company construction sites every day. It is the only developer on Bali partnered with Wyndham, Accor and Radisson — and the only foreign developer building under the Accor brand on the island.

What legal entity do I sign with?

Every contract sits under the registered Indonesian company PT High Quality Construction — you sign with a registered legal entity, not an individual or a nominee. Legal due diligence on each plot, including all permits, is handled by our in-house legal team.

What is the difference between leasehold and freehold?

Leasehold is a long-term lease — the standard structure for foreign-held resort residences on Bali — with priority extension agreed up front. Freehold (Hak Milik) is full ownership. The completed Dzen Green Fields villas in Ubud are held freehold, which is uncommon for foreign buyers and a meaningful advantage.

Does HQC actually deliver, or is this an off-plan promise?

Three completed developments demonstrate delivery: Black Rock in Ungasan, completed and income-producing since 2024; Dzen Green Fields in Ubud, completed and sold out; and the villa quarter of Ardhana Residence, completed in 2025. New buyers can still enter completed projects through resale, and active builds are documented with dated site reports.

Who manages the residences after completion?

Only Bloom is fully managed by its operator, Radisson. Satori (Accor) and the Ardhana hotel (Wyndham) run under the brand on a franchise basis, with day-to-day operations kept by HQC to the brand standard. Aravita is run by HQC’s own management company, and Black Rock by a professional management company. Owners hold a professionally managed asset.

How is build quality controlled on an island known for cracking, leaking builds?

Every structure is engineered with seismic and hydro insulation from the foundation up, with monolithic walls, multi-stage water filtration and an independent water source on each project. Mechanical, electrical and plumbing systems are designed to international standards and inspected by our in-house MEP lab, with premium equipment — ABB electrics, KONE lifts — and regular technical inspection with photo and video documentation of every key stage.

What does the structural guarantee cover?

A 10-year warranty on load-bearing structures and the pool shell, on hotel residences and villas alike, and a 12-month warranty on the interior finishes of all premises. It is backed by an in-house MEP lab and our own furniture factory, so the people who build the property also stand behind it.

Where are the projects located?

The portfolio spans three of the strongest areas on Bali. Satori and Aravita sit in Nusa Dua (Sawangan), within a kilometre of the Mulia, Apurva Kempinski and St. Regis. Bloom, Ardhana and Black Rock sit on the Bukit, minutes from Karma Kandara and Melasti beaches. Dzen sits among the rice terraces, four minutes from central Ubud.

Is HQC recognised by the industry?

Satori Nusa Dua Resort won two Real Estate Asia Built Environment Awards 2025, presented in Singapore in June 2025: Luxury Hospitality Interior Design of the Year — Indonesia and Resort Construction of the Year — Indonesia.

What infrastructure comes with a residence?

Each project carries its own resort-grade infrastructure — typically a spa, pools, restaurants, fitness, concierge and a gated, secured territory — with project-specific touches such as Aravita's yoga chalet, Bloom's Royal Spa partnership and speakeasy bar, and Ardhana's rooftop lounge and coworking. Units are delivered fully finished and furnished.

Can I see the construction before I commit?

Yes. HQC publishes dated site reports and walk-throughs for every active build, and arranges site visits at the registered Bali office by appointment. The most reliable proof that a developer delivers is the construction itself.

Can I resell my unit later?

Yes. Units are individually titled on their lease, or freehold where applicable, and can be transferred — which is why completed, sold-out projects such as the Ardhana villas, Dzen and Black Rock remain available to new buyers through resale.

Request the Investor Pack

Project brochures, construction standards and completed-project data — sent directly to you.

  • The full catalogue with floor plans
  • Project details from the HQC team
  • A direct line to the team
  • Satori Nusa Dua Resort, main building render

    Project brochures

  • MEP and systems installation at an HQC project

    Construction standards

  • Living room of a completed Ardhana villa, opening onto its private pool

    Completed-project data

All fields are required.

Privacy notice (opens in a new tab)

Prefer to talk first? Reach us directly.