Analytics cookies

With your permission, we use Google Analytics to understand how this website is used. You can decline and continue using the site.

Privacy notice
Skip to content
HQC — High Quality Construction
Aravita Residence, gated villa club render
HQC · Nusa Dua · Sawangan · Japandi villa club

Aravita Residence

A gated Japandi villa club in Sawangan — seventy-five private homes for slow, long-stay living, two minutes from the beach.

Active construction · Q2 2028

Delivery
Q2 2028
Tenure
Leasehold
Selected collection
Gated Japandi villa club — 75 villas, 1–4 bedrooms
From
Price on request
01 · The Japandi method

A pedestrian villa club, built around wabi-sabi calm

Wabi-sabi calm, held inside one closed ecosystem

Aravita — two-bedroom villa pavilion with a floating roof, glass walls and a private plunge pool set in the jungle
Aravita 4-bedroom villa at night
Aravita living room with spiral staircase

Aravita is a fully pedestrian, gated community of seventy-five private villas in Sawangan, Nusa Dua, conceived around the Japandi philosophy — Japanese wabi-sabi softened by Scandinavian restraint — for conscious long-stay living from a month upward. Inside its closed ecosystem sit a sunset lounge, a kids club, a spa, a yoga shala, two restaurants, a community centre and a gym, all reachable on foot. Every villa runs ABB electrical systems pre-assembled and tested in HQC’s own MEP laboratory, with automated doors and tunable kitchen glass; construction stands on a pile foundation of 1,234 footings, with limestone drawn from HQC’s own quarry.

Homes
75 villas
Pools
Private, per villa
Systems
ABB · own MEP lab
Tenure
Leasehold 31 + 30
02 · location

Two minutes from the beach, inside the five-star core

Sawangan is the quiet southern edge of Nusa Dua — Bali’s most established luxury enclave. The Mulia, the Apurva Kempinski, the St. Regis and HQC’s own Satori all stand within the same kilometre.

  1. Pantai Sawangan2 min
  2. Muliawithin 1 km
  3. Apurva Kempinskiwithin 1 km
  4. St. Regiswithin 1 km
  5. Satori (HQC)within 1 km
  6. Ngurah Rai airport~25 min
Open Sawangan in Maps →

HQC project location · Aravita

03 · the tour

Tour video

Aerial · HQC drone footage
Aravita architectural concept visualisation

Aravita concept film

04 · amenities

A community you never have to leave

Lifestyle

Sunset lounge

An evening lounge inside the gates

Two restaurants

On-site dining for daily life

Spa

A wellness suite for residents

Yoga shala

A dedicated space for morning practice

Gym

A fitness room within the community

Kids club

A supervised space for families

Community centre

A shared hub at the heart of the club

Service & security

24/7 reception

Round-the-clock front desk and concierge

Gated & secured

A closed, controlled territory

Perimeter walks

Pedestrian paths around the grounds

Wildlife sound barriers

Acoustic deterrents protect the green

Lightning protection

Built-in safety systems throughout

06 · the residences

By typology

Seventy-five private villas in five typologies, fifty-one to two hundred and seventy-two square metres, one to four bedrooms — each with its own private pool, terrace and sun deck, finished to HQC standard with ABB electrical systems.

Aravita one-bedroom villa floor plan preview
Area
51 m²
View
Private garden
Request pricing →

Preview layout shown here; full-resolution floor plans are sent as part of the presentation.

TypologyAreaView
1-bedroom villa51 m²Private garden
2-bedroom villa90 m²Private garden
3-bedroom villa121 m²Private garden
4-bedroom villa173 m²Private garden
Luxury villa272 m²Private
07 · why it's safe to own

The reassurance, before you ask

Build guarantee

10-year structural guarantee

1,234 footing piles, seismic frame and hydro insulation are part of the engineering scope.

Legal & tenure

Leasehold 31 + 30 via PT HQC

A 31-year leasehold with a contracted priority extension, held through a registered Indonesian entity on yellow-zone land — you sign with a company, not an individual. The exact terms are set out in the presentation pack.

08 · delivery & terms

Dates, terms and what is included

  1. 01

    31 + 30 leasehold via a registered entity

    A 31-year leasehold with a contracted priority extension, held through a registered Indonesian entity on yellow-zone land — you sign with a company, not an individual. The exact terms are set out in the presentation pack.

  2. 02

    Engineered to HQC standard

    ABB electrical systems are pre-assembled and tested in our own MEP laboratory; construction stands on a pile foundation of 1,234 footings, with limestone drawn from HQC’s own quarry.

  3. 03

    Turnkey handover, fully furnished

    Villas are delivered fully finished and furnished, with in-house construction, MEP, joinery and furniture.

Why Aravita holds its value

  • A gated, fully pedestrian community in Sawangan — within a kilometre of the Mulia, the Apurva Kempinski and the St. Regis.
  • Built for conscious long-stay living from a month upward — the deepest, least seasonal kind of demand on the island.
  • Engineered to HQC standard, with ABB systems pre-assembled in our own MEP lab and a 1,234-footing pile foundation.
  • A registered Indonesian entity holds the lease, with a contracted priority extension agreed up front.
Site report · September 2026

Construction progress

The latest site report from our own cameras, in English. Every active build is reported on the construction page.

Aravita site report, September 2026
All site reports →
09 · questions

What buyers ask us first

How many villas are there, and what sizes?

Seventy-five private villas in one to four bedrooms, plus a Luxury villa — interiors run from fifty-one to two hundred and seventy-two square metres, each with its own private pool.

What is the architectural style?

Japandi — Japanese wabi-sabi combined with Scandinavian minimalism — inside a fully pedestrian, gated ecosystem designed for calm.

Is Aravita for short stays or for living?

It is designed for conscious long-term stays, from a month upward, with amenities to support living rather than a quick holiday.

What technology is built into the villas?

Automated door systems, adjustable kitchen-glass tinting and ABB electrical systems assembled and tested in HQC’s own MEP laboratory.

What does the lease structure mean for me?

A thirty-one-year leasehold with a contracted priority extension, held through a registered Indonesian entity on yellow-zone land — you sign with a company, not an individual. The exact terms are set out in the presentation pack.

How is Aravita built?

On a pile foundation of 1,234 footings, with limestone from HQC’s own quarry and ABB electrical systems pre-assembled in our own MEP laboratory — backed by a 10-year structural and 12-month finishing guarantee.

How close is the beach?

Sawangan beach is two minutes away, and the five-star core of Nusa Dua — the Mulia, the Apurva Kempinski and the St. Regis — sits within a kilometre.

When will Aravita be completed?

Delivery is scheduled for Q2 2028, and the villas are selling now. Each villa comes fully finished and furnished, with construction, MEP, joinery and furniture by HQC’s own teams.

10 years

10-year warranty on load-bearing structures and the pool shell

12-month warranty on the interior finishes of all premises

Other projects

Satori Nusa Dua Resort, main building day render
Active constructionQ3 2027

Satori Hotel

Nusa Dua

116 hotel rooms, 28.6–46.7 m²

REA Award 2025

Hotel brand: AccorLeasehold

Price on request

View
Aerial view of Ardhana hotel and central pool
Active constructionQ3 2027

Ardhana Hotel

Bukit

58 hotel rooms — apartments and loft suites

Hotel brand: WyndhamLeasehold

Price on request

View
Bloom hotel building render
Active constructionQ1 2028

Bloom

Bukit

Design hotel, 103 hotel rooms · Ungasan

BY Radisson IndividualsLeasehold

Price on request

View
Request

Get the Aravita presentation

  • The full catalogue with floor plans
  • Project details from the HQC team
  • A direct line to the team

All fields are required.

Privacy notice (opens in a new tab)

Prefer to talk first? Reach us directly.