Analytics cookies

With your permission, we use Google Analytics to understand how this website is used. You can decline and continue using the site.

Privacy notice
Skip to content
HQC — High Quality Construction
Quality

A direct dialogue with the builders. Maximum construction transparency

HQC: a systematic developer with personal accountability.

The HQC construction crew on site at Ardhana Residence
10 years
Structural guarantee
12 months
Warranty on interior finishes
Regular technical inspections of construction work
Photo / video reports
3
Global hospitality operators
01 · The HQC Team

Three leaders, personally accountable

Dmitry Barannik, co-founder of HQC, construction and structural works

Dmitry Barannik

Co-founder of HQC · Construction & Structural Works

Civil engineer (Ural Federal University); 15 years in construction, from tradesman to head of major projects. 550,000+ m² of premium residential and commercial space completed across the CIS. On Bali, personally led Black Rock, Ardhana and Dzen Green Fields.

Igor Bazanov, co-founder of HQC and CEO of PT HQC

Igor Bazanov

Co-founder of HQC · CEO of PT HQC

Graduate of the Institute of Public Administration and Management, RANEPA. Responsible for architecture and design, project concepts, overall vision and strategic management.

Anton Zanimonets, managing partner of HQC and CEO of BLOOM

Anton Zanimonets

Managing Partner of HQC · CEO of BLOOM

PhD in Philology (Moscow State University), MBA; 15 years in investment management. Founder of Iskander.vc (AUM of about IDR 1.1 trillion), co-founder of the Bali Developers Association; brings top-tier international hotel operators into projects.

Founded in 2023 · 7 premium complexes · 814 units in the portfolio · 800+ team on the ground: 100+ staff engineers and managers, plus 700+ people working on company construction sites every day. · 59,203 m² total portfolio area · $166.2M company portfolio

What is HQC

HQC is a full-cycle institutional developer. We control every stage: from legal land audits and design through construction, furnishing (our own 4,000 m² factory), and hotel management.

The advantage of this model

Our model eliminates the typical conflicts of interest that arise when responsibility gets passed between brokers, contractors, and management companies. The investor works with a single legal entity, HQC, which bears full financial and operational responsibility.

02 · The guarantee

What the guarantee actually covers

We build as if for ourselves — and take pride in it.

10 years

10-year warranty on load-bearing structures and the pool shell

12-month warranty on the interior finishes of all premises

10 years
Load-bearing structures · pool shell
12 months
Interior finishes of all premises
Bathroom fixtures and plumbing in an HQC residence
Interior finishes covered by the 12-month warranty.
03 · The build

Full-cycle developer — from design & engineering to operator handover

Regular technical inspection, with photo and video documentation.
  1. HQC design and engineering stage
    01

    Design & engineering

    Architecture, structure and MEP designed together

  2. Foundation and frame works at an HQC project
    02

    Foundation & frame

    Seismic frame and hydro insulation laid

  3. MEP and systems installation at an HQC project
    03

    MEP & systems

    Water lines, electrical and imported equipment installed

  4. Bloom lobby — finished marble reception
    04

    Finishing

    Interior finishes to a hospitality standard

  5. HQC furniture and FF&E installation
    05

    Furniture & FF&E

    Our own factory fits out every unit

  6. The HQC and Accor teams at the Accor office
    06

    Operator handover

    Inspected and handed over for brand operation

04 · Method

How international construction standards reach resort real estate

Rigorously vetted engineering. Trusted by Wyndham, Accor and Radisson.

Design, construction, MEP, furniture and management under one roof — the only foreign developer building under the Accor brand on Bali.

Audited

MEP engineering

World-class MEP engineering — independent quality control and strict international standards instead of the basic local minimum.

In-house

MEP + furniture

Our own lab and furniture factory.

Continuous

Quality control

Inspected, not checked once at the end.

Documented

Site reports

Dated reports published for every build.

05 · What we build in

Six things you cannot see

01

Seismic & hydro insulation

The frame is engineered for seismic movement and sealed against groundwater.

Why it matters on Bali

Bali sits on an active seismic belt with an intense wet season.

Without it: Cracking, damp and structural fatigue within a few years

ProofEngineered into every project from the foundation up
02

Audited MEP standards

Electrical, plumbing and climate systems on every property are inspected by our in-house lab.

Why it matters on Bali

The local floor is far below international practice.

Without it: Short equipment life and safety risk

ProofIn-house MEP lab across the portfolio
03

In-house furniture factory

Joinery, beds and casegoods produced in our own 4,000 m² factory.

Why it matters on Bali

Outsourced FF&E arrives late and inconsistent.

Without it: Delays at handover and a patchwork interior

ProofOwn 4,000 m² furniture factory
04

Premium equipment

ABB electrical systems, KONE lifts and lab-tested climate and pool equipment.

Why it matters on Bali

Local equipment fails fast in the climate.

Without it: Constant repairs and downtime

ProofABB electrics and KONE lifts, with an energy passport per villa
05

Three-stage quality assurance

Engineering, finishing and operator handover inspections.

Why it matters on Bali

A single final check misses what is already sealed up.

Without it: Defects discovered only after guests arrive

ProofRegular technical inspection with photo and video documentation
06

Legal under PT HQC

The Indonesian entity holds the lease; you sign with a registered company.

Why it matters on Bali

Nominee structures are common and risky.

Without it: No legal recourse if anything goes wrong

ProofRegistered PT entity on every contract
06 · Recognition

Independent recognition

HQC at the Real Estate Asia Built Environment Awards 2025 ceremony in Singapore
REA Awards 2025 · Singapore.
  1. 2025

    Resort Construction of the Year — Indonesia

    Real Estate Asia Built Environment Awards 2025, Singapore — for Satori Nusa Dua Resort.

  2. 2025

    Luxury Hospitality Interior Design of the Year — Indonesia

    Real Estate Asia Built Environment Awards 2025, Singapore — for Satori Nusa Dua Resort.

Endorsed by market leaders: Wyndham, Accor, Radisson

Global hotel giants protect their reputation and brands closely. Before putting their names on the Satori, Ardhana, and Bloom residences, Wyndham, Accor, and Radisson conducted comprehensive technical, infrastructure, and legal due diligence on our properties.

The most reliable proof that a developer delivers is the construction itself.

See the standard for yourself

Dated site reports and walk-throughs published for every active build.
See it for yourself

Book a construction site visit

  • The full catalogue with floor plans
  • Project details from the HQC team
  • A direct line to the team

All fields are required.

Privacy notice (opens in a new tab)

Prefer to talk first? Reach us directly.