Analytics cookies

With your permission, we use Google Analytics to understand how this website is used. You can decline and continue using the site.

Privacy notice
Skip to content
HQC — High Quality Construction
Dzen Green Fields villa at twilight with infinity pool
HQC · Projects · Dzen Green Fields

Dzen Green Fields

Ten barnhouse villas above the Ubud rice terraces — completed, freehold, and lived in.

Construction complete · Completed May 2025

Delivery
Completed May 2025
Tenure
Freehold
Selected collection
Boho villas among the rice terraces — 10 villas
From
Price on request
01 · Ownership

A boutique complex — ten villas, no more

Full ownership, not a lease

Dzen double-height boho living room with rice-field view
Dzen mezzanine view over living room and pool
Dzen living room facing the rice terraces

Dzen Green Fields is a finished boutique complex of ten barnhouse villas tucked among working rice terraces four minutes from central Ubud, completed in May 2025. The architecture pairs double-height interiors with full-height panoramic glass and doors, finished in a light, harmonious boho palette. Each villa steps out to a fifteen-square-metre infinity pool angled towards the sunrise over the fields, on a private plot of roughly 1.7 to 1.9 are. Its rarest feature is freehold tenure — full ownership rather than a lease; the holding structure for a foreign buyer is confirmed with a qualified Indonesian lawyer.

Floors
1–2
Plot
1.7–1.9 are
Pool
15 m² infinity
Tenure
Freehold
02 · location

Four minutes from Ubud, a world away

On the edge of working rice terraces, with the everyday city close by: a minute to the main road and the Wood international school, three to Parq Family, and Ubud’s culture and wellness on the doorstep.

  1. Central Ubud4 min
  2. Main road1 min
  3. Wood international school1 min
  4. Parq Family3 min
Open Ubud in Maps →

HQC project location · Dzen

03 · the tour

Tour video

Dzen archive flyby — October 2024

Dzen archive flyby — October 2024

04 · amenities

One specification, ten times over

The villa

15 m² infinity pool

Oriented to the sunrise over the rice fields

Plot 1.7–1.9 are

Roughly 170–190 m² of private land per villa

Turnkey & furnished

Furniture and appliances included on handover

Double-height living

Double-height interiors under full-height panoramic glass

Systems & site

Workspace per bedroom

A dedicated desk in every room

Multi-stage water filtration

Own, filtered water supply to each villa

Bike & car parking

Private parking on every plot

Boutique format

Ten villas only — a small, contained community

06 · the residences

By typology

A boutique run of ten barnhouse villas in three built-area groups — each on a private plot of 1.7 to 1.9 are, with its own sunrise-facing infinity pool and rice-terrace aspect.

Dzen villas 1 and 2 108 square metre one-storey technical plan preview
Area
108 m² · 1 storey
View
Rice terraces · sunrise
Request pricing →

Preview uses the Dzen presentation and technical master-plan sources: villas №1–2 are listed as 108 m², 1 storey. Full-resolution sheets are sent as part of the completed-project pack.

TypologyAreaView
Barnhouse villa · 108 m²108 m² · 1 storeyRice terraces · sunrise
Barnhouse villa · 117 m²117 m² · 2 storeysRice terraces · sunrise
Barnhouse villa · 133 m²133 m² · 2 storeysRice terraces · sunrise
07 · why it's safe to own

The reassurance, before you ask

Build guarantee

10-year structural guarantee

Construction completed in May 2025 and occupied, so the guarantee backs a real, built property.

Legal & tenure

Freehold title

Held freehold — full ownership rather than a lease; the exact holding structure for a foreign buyer is confirmed with a qualified Indonesian lawyer case by case.

08 · delivery & terms

Dates, terms and what is included

  1. 01

    Freehold title

    Held freehold — full ownership rather than a lease; the exact holding structure for a foreign buyer is confirmed with a qualified Indonesian lawyer case by case.

  2. 02

    Built end to end by HQC

    Frame, seismic and hydro insulation, finishes, joinery, MEP and multi-stage water filtration installed by our own teams — not subcontracted away.

  3. 03

    Construction completed May 2025, occupied

    A completed, lived-in property: the photography on this page is of the finished villas, not a visualisation. The original release sold out; completed villas can become available through resale.

Why Dzen is rare

  • Freehold tenure — full ownership, uncommon for a foreign buyer on Bali, on a finished and occupied build.
  • A completed, sold-out complex in Ubud — proven demand and a build you can inspect, reachable through occasional resale.
  • Ten villas among working rice terraces, four minutes from central Ubud’s culture and wellness economy.
  • Each villa built around a sunrise-facing infinity pool — the defining feature of the site.
09 · questions

What buyers ask us first

Is Dzen actually built?

Yes — construction was completed in May 2025 and the complex is occupied; the photography on this page is of the finished villas.

What does freehold mean here?

Freehold (Hak Milik) is full ownership rather than a lease — uncommon for a foreign buyer on Bali and a meaningful advantage; the exact ownership structure is confirmed with our lawyer case by case.

It says sold out — can I still buy?

The original release sold out; completed villas can become available through resale, transferable on their freehold title.

How big is the complex?

A boutique ten-villa complex of one- and two-storey barnhouses, each on a private plot of roughly 1.7 to 1.9 are.

Does each villa have a pool?

Yes — a fifteen-square-metre infinity pool per villa, oriented to the sunrise over the rice fields.

Who built and stands behind it?

HQC built it end to end with in-house MEP and furniture, with a 10-year structural and 12-month finishing guarantee.

Where is Dzen?

Among working rice terraces four minutes from central Ubud; the main road and the Wood international school are a minute away, and Parq Family is three.

What villa sizes are there?

Three built-area groups: 108 m² on one storey, and 117 m² or 133 m² on two storeys. Every villa was completed turnkey, furniture and appliances included.

10 years

10-year warranty on load-bearing structures and the pool shell

12-month warranty on the interior finishes of all premises

Other projects

Satori Nusa Dua Resort, main building day render
Active constructionQ3 2027

Satori Hotel

Nusa Dua

116 hotel rooms, 28.6–46.7 m²

REA Award 2025

Hotel brand: AccorLeasehold

Price on request

View
Aravita 4-bedroom villa exterior, day
Active constructionQ2 2028

Aravita Residence

Nusa Dua

Gated Japandi villa club — 75 villas, 1–4 bedrooms

Leasehold

Price on request

View
Aerial view of Ardhana hotel and central pool
Active constructionQ3 2027

Ardhana Hotel

Bukit

58 hotel rooms — apartments and loft suites

Hotel brand: WyndhamLeasehold

Price on request

View
Request

Get the Dzen Green Fields pack

  • The full catalogue with floor plans
  • Project details from the HQC team
  • A direct line to the team

All fields are required.

Privacy notice (opens in a new tab)

Prefer to talk first? Reach us directly.