Analytics cookies

With your permission, we use Google Analytics to understand how this website is used. You can decline and continue using the site.

Privacy notice
Skip to content
HQC — High Quality Construction
Satori Nusa Dua Resort, aerial
HQC · Nusa Dua · Sawangan · Branded by Accor

Satori Hotel

116 hotel rooms, 28.6–46.7 m²

Active construction · Q3 2027

Delivery
Q3 2027
Tenure
Leasehold
Selected collection
116 hotel rooms, 28.6–46.7 m²
From
Price on request
01 · The concept

The Satori Concept

Omotenashi — hospitality before the request is made

Satori junior suite interior
Satori Nusa Dua Resort at night
Satori Suite Ocean living room

Satori is 38 villas and 116 hotel rooms in Nusa Dua under the Accor brand, designed around the principles of Quiet Luxury. The complex includes the Fusion restaurant, a pool bar, a spa, a fitness room, a pool with a lounge area, a kids' room, coworking and 24/7 concierge service — five minutes on foot from Pantai Sawangan. Leasehold 32+30 years with guaranteed extension at the tax (cadastral) value of the land.

Plot
1.5 ha
Floors
4
Pools
3
Brand
Accor (franchise)
02 · location

Location: Nusa Dua

Nusa Dua is the epicentre of premium tourism, known for its five-star hotels and fine-dining restaurants. Satori’s residences are just 5 minutes from the best beaches and 20 minutes from the international airport — concentrating all the infrastructure needed for both an exclusive lifestyle and successful investment.

  1. Pantai Sawangan5 min on foot
  2. Muliawithin 1 km
  3. Apurva Kempinskiwithin 1 km
  4. St. Regiswithin 1 km
Open Nusa Dua in Maps →

HQC project location · Satori

Brand partner

Operated to Accor's own hospitality standard

Accor

Satori runs under the Accor brand on a franchise basis: Accor sets the standards and brings its distribution and loyalty programme, while HQC runs day-to-day operations.

Accor-branded resort residence in Sawangan, Nusa Dua
03 · the tour

Tour video

Aerial · HQC drone footage
04 · amenities

A managed address, not a self-run villa

Resort

Shared pool & bar

Three pools across the resort grounds

Spa

A wellness suite for guests and owners

Rooftop

A pergola-shaded terrace and lounge bar

Restaurant

A managed dining room on site

Gym

A fitness room for residents

Kids’ room

A supervised space for families

Lobby

A staffed arrival and reception hall

Service

24/7 reception

Round-the-clock front desk

Partner concierge

Booking, transfers and guest services

Gated & secured

A controlled, secured territory

Parking

On-site resident and guest parking

06 · the residences

By typology

From elegant studios to exclusive villas with private pools — each designed for maximum comfort and privacy. Villas: 48–128 m², one to four bedrooms, one or two floors, private pool, turnkey furnished with ABB electrical systems. Rooms: 28.6–46.7 m², with ocean, mountain or garden aspects.

Satori Loft Collection Big 46.68 square metre two-floor plan preview
Area
46.7 m²
View
Pool view
Request pricing →

Preview shows the Loft Collection Big two-floor layout from the presentation source; full-resolution sheets are sent as part of the presentation.

TypologyAreaView
Loft Collection (Big)46.7 m²Pool view
Loft (Small)42.7 m²Garden
Junior Suite34.2 m²Pool view
Deluxe Tranquility28.6 m²Garden
Suite44.6 m²Top floor
07 · why it's safe to own

The reassurance, before you ask

Recognition

Real Estate Asia Built Environment Awards 2025

2 awards — Luxury Hospitality Interior Design of the Year — Indonesia, Resort Construction of the Year — Indonesia.

Brand

Accor brand standard

Satori runs under the Accor brand on a franchise basis: Accor sets the standards and brings its distribution and loyalty programme, while HQC runs day-to-day operations.

Build guarantee

10-year structural guarantee

Seismic and hydro insulation are engineered into the structure the warranty covers.

Legal & tenure

Leasehold 32 + 30 via PT HQC

A 32-year lease with a contracted 30-year extension, held through the Indonesian entity PT HQC — you sign with a registered company, on pink-zone (tourism / commercial) land.

08 · delivery & terms

Dates, terms and what is included

  1. 01

    32 + 30 leasehold via PT HQC

    A 32-year lease with a contracted 30-year extension, held through the Indonesian entity PT HQC — you sign with a registered company, on pink-zone (tourism / commercial) land.

    Signing a property agreement with a key on the table
  2. 02

    Built by in-house teams

    Frame, seismic and hydro insulation, finishes, joinery and MEP are installed by our own teams — not subcontracted away.

    HQC construction team checking a wall with a spirit level
  3. 03

    Finishing & amenities: impeccable standards

    Natural materials — marble, teak, natural stone. Fully furnished and turnkey-equipped by HQC’s own furniture factory, with heated plumbing fixtures and smart locks; a backup generator ensures uninterrupted power supply. HQC’s own furniture factory guarantees unique design, quality control and precise furniture delivery timelines.

    Finished kitchen and dining area with natural materials

Project terms

  • Under the Accor brand, on a franchise basis.
  • Instalment plan through the end of construction.
  • Building permit (PBG) obtained.
Site report · September 2026

Construction progress

The latest site report from our own cameras, in English. Every active build is reported on the construction page.

Satori site report, September 2026
All site reports →
09 · questions

What buyers ask us first

What does the 32+30 lease mean for me?

A 32-year leasehold with a contracted 30-year extension, held through the Indonesian entity PT HQC — you sign with a registered company, on pink-zone (tourism / commercial) land.

Who manages the property after launch?

Satori runs under the Accor brand on a franchise basis. Accor sets the service standards and brings guests through its channels and loyalty programme; HQC runs the operations day to day.

What guarantees come with the build?

A 10-year structural guarantee on the hotel rooms and the villas alike, and a 12-month finishing guarantee — backed by our in-house MEP lab and furniture factory.

How close is the beach, and who are the neighbours?

Pantai Sawangan is five minutes on foot; Mulia, Apurva Kempinski and St. Regis are all within the same kilometre, in the quiet south of Nusa Dua.

Can I resell my unit later?

Yes — units are individually titled on the lease and can be transferred.

What's included in the handover?

A fully finished, furnished and operator-ready unit; the detailed inventory is in the presentation pack.

When will Satori be completed?

Delivery is scheduled for Q3 2027, and Satori is selling now; the building permit (PBG) has been obtained.

What unit types are there?

116 hotel rooms in five types — Deluxe Tranquility (28.6 m²), Junior Suite (34.2 m²), Suite (44.6 m²) and two-floor Lofts of 42.7 and 46.7 m² — and 38 villas of 48 to 128 m², with one to four bedrooms and a private pool.

10 years

10-year warranty on load-bearing structures and the pool shell

12-month warranty on the interior finishes of all premises

Other projects

Aravita 4-bedroom villa exterior, day
Active constructionQ2 2028

Aravita Residence

Nusa Dua

Gated Japandi villa club — 75 villas, 1–4 bedrooms

Leasehold

Price on request

View
Aerial view of Ardhana hotel and central pool
Active constructionQ3 2027

Ardhana Hotel

Bukit

58 hotel rooms — apartments and loft suites

Hotel brand: WyndhamLeasehold

Price on request

View
Bloom hotel building render
Active constructionQ1 2028

Bloom

Bukit

Design hotel, 103 hotel rooms · Ungasan

BY Radisson IndividualsLeasehold

Price on request

View
Request

Get the Satori presentation

  • The full catalogue with floor plans
  • Project details from the HQC team
  • A direct line to the team

All fields are required.

Privacy notice (opens in a new tab)

Prefer to talk first? Reach us directly.