Wyndham brand standard
Ardhana’s boutique hotel runs under the Wyndham brand on a franchise basis — the world’s largest hotel franchise network, across upward of ninety countries — while HQC runs day-to-day operations to the brand standard.
With your permission, we use Google Analytics to understand how this website is used. You can decline and continue using the site.
Privacy notice
58 hotel rooms — apartments and loft suites
Active construction · Q3 2027
Designed on Feng Shui and Vastu, greened to the rooftops



Ardhana sits on an Ungasan hillside above the ocean, in direct sightline of the GWK Garuda statue, pairing two villa quarters — Luxury and Fengshui — with the Smart quarter, a boutique hotel that gives the whole community its own five-star infrastructure. The villas were completed in June 2025 and are now occupied; the Wyndham-branded boutique hotel completes in Q3 2027. The architecture is an eclectic Asian register, and the entire site — including the villa roofs — is greened and planned by Feng Shui and Vastu, then engineered to HQC’s full spec.
Ardhana looks out over the ocean and the GWK Garuda statue from the Bukit at Ungasan, with the south’s beaches, surf and international schooling all within a short drive of the gate.
HQC project location · Ardhana
Ardhana’s boutique hotel runs under the Wyndham brand on a franchise basis — the world’s largest hotel franchise network, across upward of ninety countries — while HQC runs day-to-day operations to the brand standard.

Hotel rooms

Villa, 1 bedroom

Villa, 2 bedrooms

Villa, 3 bedrooms
Spa
A wellness suite for owners and guests
Yoga studio
A dedicated studio on site
Pool bar
Pools across the villas and the hotel
Fitness
A gym for residents
Restaurant
A managed dining room on site
Rooftop lounge bar
A rooftop lounge with an ocean view
Coworking
A shared workspace within the community
Kids’ room
A supervised space for families
Five-star service
Run to the operator’s hospitality standard
Gated & secured
A controlled, walking-friendly site
Walking park
Landscaped grounds and a walking park





















Two villa quarters — Luxury and Fengshui — sit alongside the Smart quarter, a boutique hotel of apartments and lofts. Every unit is turnkey-furnished, with filtered pools on the villas and ocean, Garuda, jungle or park aspects depending on position on the hillside.

Preview layout shown here; full-resolution floor plans are sent as part of the presentation.
| Typology | Area | View |
|---|---|---|
| Loft suite | 59.8–79.6 m² · 2 floors | Ocean · Garuda |
| Luxe apartment | 78 m² · 1 floor | |
| Standard apartment | 25–30 m² | Ocean · jungle · Garuda |
Ardhana’s boutique hotel runs under the Wyndham brand on a franchise basis — the world’s largest hotel franchise network, across upward of ninety countries — while HQC runs day-to-day operations to the brand standard.
The completed villa quarter demonstrates the structural system before the boutique hotel completes.
You sign with a registered Indonesian entity, on pink-zone (tourism) land.
Construction of the villa quarter was completed in June 2025, with the boutique-hotel foundations laid alongside — delivery you can walk through, not an off-plan promise.
The villa quarter held its soft opening as the hotel’s lower floors took shape, with the first two levels framed through autumn 2025.
A January 2026 aerial documented the completed villas and the rising boutique hotel on the Ungasan hillside.
The Wyndham-branded boutique hotel completes in Q3 2027, bringing the community’s five-star infrastructure fully online.
The latest site report from our own cameras, in English. Every active build is reported on the construction page.

The villas were completed in June 2025 and are now occupied; availability is through resale, while the Wyndham-branded boutique hotel completes in Q3 2027.
The boutique hotel runs under the Wyndham brand on a franchise basis; HQC runs day-to-day operations to the brand standard.
A 30-year leasehold with a priority 30-year extension, held through the developer’s registered Indonesian structure on residential-zoned land.
Two villa quarters — sixteen Luxury villas (1–3 bed, 70–155 m²) and seven Fengshui villas (48 m²) — alongside the Smart quarter, a boutique hotel of fifty-eight rooms: Standard and Luxe apartments and two-storey Loft suites.
The ocean, the GWK Garuda statue, the jungle or a park, depending on the unit and its position on the hillside.
The site is planned by Feng Shui and Vastu in an eclectic Asian register, with greenery carried across the whole community — including the villa roofs.
A 10-year warranty on load-bearing structures and the pool shell, on the hotel units and the villas alike, and a 12-month warranty on the interior finishes of all premises — backed by monolithic walls, multi-stage water filtration and forced ventilation with air-conditioning.
Melasti and Pandawa are each about ten minutes away, Jimbaran is twelve, surf spots are fifteen, and a Cambridge international school sits seven minutes from the gate.
10 years
10-year warranty on load-bearing structures and the pool shell
12-month warranty on the interior finishes of all premises

Bukit
Design hotel, 103 hotel rooms · Ungasan
Price on request
View

Nusa Dua
116 hotel rooms, 28.6–46.7 m²
REA Award 2025
Price on request
ViewPrefer to talk first? Reach us directly.